Leaf Eater Advanced 3 inch or 4 inch from Rain Harvesting Pty by Blue Mountain Co. RHAD100
Shipping Information
Shipping Information
Shipping costs are based on your order’s weight, location, and selected shipping option. We strive to ship orders quickly, with expedited orders (Next Day Air or 2 Day) going out the same business day if placed before 4:30PM EST.
Description
Description
Features:
- Compact, versatile rain head for quick and easy installation
- New design now includes adapters for BOTH a 3" and a 4" outlet
- Patented single screen technology for advanced debris shedding (Clean Shield™)
- Minimal maintenance
- Pivot the outlet to suit vertical or horizontal (rear outlet) downpipes – a variety of installation options in one product (VH Pivot™ patent pending)
- High flow rate performance
- Superior catchment efficiency at low and high flow rates
- Single screen with 0.955mm aperture mosquito proof stainless steel mesh.
- The Leaf Eater AdvancedTM can also be used as a debris removing device even when rainwater is not being collected.
Installation
Gutter & Mid-Mount Installation
1. Gutter: Measure 208mm from the bottom of the existing gutter pop and remove this section of the downpipe. Ensure the cut edge is clean and smooth. Mid-Mount: Remove 208mm of downpipe where the Leaf Eater Advanced™ is to be situated. Ensure all cut edges are clean and smooth.
2. Using the quick-release tabs remove the Cleanshield screen by lifting it up and then out.
3. Insert the Leaf Eater Advanced™ by sliding it up over the cut section and then down into position. The Leaf Eater Advanced™ outlet should be slid firmly onto the bottom downpipe until it can be pushed no further.
4. Screw the Leaf Eater Advanced™ into position through the screw slots provided. Ensure appropriate screws and anchors (if required) are used.
5. Insert the Cleanshield screen into the Leaf Eater Advanced™. Ensure the Cleanshield screen is sitting firmly in place and check installation is secure.
Horizontal (Rear Outlet) Installation
1. Using the quick-release tabs remove the Cleanshield screen by lifting it up and then out.
2. Swivel the outlet to the horizontal position – some force may be required.
3. Position the Leaf Eater Advanced™ next to existing pipework, mark and cut top and bottom cut lines... Ensure that the cut edge is clean and smooth.
4. Insert the Leaf Eater Advanced™ by sliding the rear outlet into the horizontal pipe. The back fixing plate must sit behind the top section of the downpipe.
5. Screw the Leaf Eater Advanced™ into position through the screw slots provided. Ensure appropriate screws and anchors (if required) are used.
6. Insert the Cleanshield screen into the Leaf Eater Advanced™. Ensure the Cleanshield screen is sitting firmly in place and check the installation is secure.
Specifications
Specifications
Reviews (3)
Reviews (3)
Safe & Secure Checkout
Enjoy a Safe & Secure Checkout with advanced encryption and trusted payment gateways, ensuring your information stays protected every step of the way.



